Write down who will use the vehicles, when work is available and how you will be paid. A corporate shift, a platform assignment and an open ride-hail shift create different operating requirements. Separate confirmed work from expected demand so the first fleet size is based on evidence.
Record the proposed route or service area and operating windows.
List vehicle requirements, payment timing and who approves completed work.
Identify the person responsible when planned work is unavailable.
02 /
Build a shift that includes charging and handover
Map the full day, including travel to demand, driver handover, charging, breaks and the return journey. Check charging access along the actual route and agree a backup location. Use vehicle and charger information for the specific models you are considering; a headline range or charger rating alone does not describe the working shift.
Assign a driver and replacement contact for each shift.
Record charging access hours, waiting time and payment arrangements.
Plan where the vehicle will wait when it is not earning.
03 /
Test a small operation before adding vehicles
Build a per-vehicle worksheet for lease or ownership cost, driver payments, energy, maintenance and collections. Label assumptions separately from recorded results. Run an initial group of vehicles and compare the plan with actual kilometres, charging time, missed shifts and cash received before committing to expansion.
Review vehicle readiness and unresolved issues before the next shift.
Compare earnings and collections separately; money billed may not yet be received.
Expand only when the operating responsibilities and working-day assumptions are clear.